MOSS SIDE LEISURE CENTRE
Moss Side Leisure Centre
DURATION: 52 Weeks
SCHEME: Refurbishment of the existing leisure centre with a full strip-out of existing M&E filtration plant and installation of new.
ardHat are please to announce that we will be working along side ISG once again on this £4.5m development of the Moss Side Leisure Centre where we have been instructed to provide Guarding, Biometric Turnstiles, full CCTV coverage and installation of 4K Time Lapse cameras.
OUR CUSTOMER
Alex Mastroddi, Senior Site Manager at ISG wanted a proven construction service provider that would ensure that this project runs without incident.
Through early discussions with HardHat we were able to focus on the risks that would be present to the public and project. HardHat then presented a number of priced options for us to establish a secure and safe site. The security package included Guarding to provide cover for the riskier periods on site. Installation of security gatehouse with Fingerprint Recognition for controlled access and egress to the site. As well as HD CCTV for 24 hour coverage and 4K Time Lapse cameras so that our client can track progression of works on site.
With over 20 years experience HardHat were able to work closely with ISG in able to provide a package that ensures our clients on-going confidence in our exceptional reputation.
Damon Atkinson, HardHat Systems Manager commented “We are privileged to be apart of this community leisure centre development with ISG and our delighted our relationship with them goes from strength to strength”
From design to delivery HardHat are able to oversea the program and release the project team to focus on building matters rather that non-critical services we manage.